CASE STUDY / Astra Polytechnic

P3P Project Management Application

A centralized project management application for Astra Polytechnic's P3P study program, enabling lecturers to access consistent student project data, monitor progress, and manage project documentation.

Nov 2023 – Feb 2024Team lead and full-stack developerSoftware developmentBusiness analysis

Overview

A project management web application developed for the Pembuatan Peralatan dan Perkakas Produksi (P3P) study program at Astra Polytechnic. The application provides a centralized platform for managing student project information, monitoring progress, and organizing project documentation.

Developed based on an actual internal campus requirement, the project aimed to improve how lecturers access and manage student project data across the study program.

Problem (As-Is)

Before the application was introduced, students shared their project documentation with lecturers through individual Google Drive links. Since each lecturer could maintain separate links and folders, project information became scattered across different locations.

This made it difficult to maintain a consistent source of project information, particularly when multiple lecturers needed to access or monitor the same student projects.

A lecturer representing the study program identified this issue and requested a centralized system to ensure that project data could be accessed consistently by the relevant lecturers.

Our Proposed Solution (To-Be)

Our team developed a centralized project management application where student project information and documentation could be stored and accessed through a shared platform.

Instead of relying on separate Google Drive links, lecturers could access consistent project records, monitor project progress, review task assignments, and view project timelines from one place.

Key Features

  1. Project Dashboard: Displays an overview of student projects and their progress.
  2. Gantt Chart: Visualizes project timelines and task progress.
  3. Task Management: Supports task assignments and progress monitoring.
  4. Data Visualization: Presents project information through visual representations.
  5. Document Management: Provides a centralized location for uploading and storing project documentation.

Jobdesk

  • Led a team with three-members in developing a web application for monitoring and store project data of Astra Polytechnic’s prodi Pembuatan Peralatan dan Perkakas Produksi (P3P).
  • Developed the web application with Gantt Chart feature for progress tracking, project dashboard, data visualization, task assignment, and upload and store data features.
  • Develop the application into 2 versions, using React.js, .NET and SQL Server for version 1, and PHP, Laravel, and MySQL for version 2.